Queensland Fisheries

Salvinia weed spreads violently through spring and summer time. A fish passageway installed by DEEDI was quickly being clogged by this noxious weed. Project Overview Date: September 2011 Location: Bundaberg, Queensland, Australia Features Summary Boom Length:Boom Material:Float:Ballast: 45m length with 300mm skirt depthHeavy Duty ElvaloyClosed Cell PE Foam6mm galvanised [...]

Australia Pacific LNG Project

Supply, delivery and install of a floating baffle system to increase retention times within the brine pond. Project Overview Date: August, 2011 Location: Spring Gully, Queensland, Australia Features Summary Boom Length: Boom Material: Float: Ballast: 150m UV Resistant 900gsm PVC Closed Cell PE Foam 8mm Galvanised Chain [...]

Leightons Sydney Motorway Upgrade

Chatoyer Environmental advised Leightons on the best spill response and site environmental protection products to meet their requirements. Project Overview Date: January 2011 - ongoing Location: Sydney, New South Wales, Australia Features Summary Materials used: SpilMax Marine Spill Kits (for application during bridging works) SpilMax General Purpose Spill Kits [...]

New South Wales Fire Brigades

To design and manufacture a combination of containment booms that can be hand carried to specific incidents and deployed rapidly with ease. Project Overview Date: May, 2009 Location:   Sydney, New South Wales, Australia Features Summary Materials used: Design: Production: Ballast: Connectors: Each boom is 10.0m long Fire Resistant [...]

Melbourne Water – Silvan Dam

To contain debris and sediment from entering the city of Melbourne's water supply. The dam has very high flow rates and a quality boom is required to withstand the stresses placed on it. Project Overview Date: March, 2009 Location: Silvan Dam, Yarra Valley, Victoria, Australia Features Summary Boom Length: Skirt [...]

McConnell Dowell Aquatic Silt Curtain

To supply, deliver and install aquatic silt curtain and innovative primary containment curtain to facilitate dredging operations in Port Kembla. Project Overview Date: November, 2010 Location: Port Kembla, New South Wales, Australia Features Summary Boom Length: 820m with variable skirt depth from 9m to 12m deep 190m with [...]

Royal Australian Navy

To design and manufacture a unique heavy duty containment boom with patented absorbtion boom attached. The boom was to be housed in a unique system operating from a 40' container allowing rapid deployment and convenient storage. Project Overview Date: August, 2010 Location: Perth, Western Australia, Australia Features Summary Boom Length: [...]

National Maritime Museum Forecourt

To supply, deliver and install aquatic silt curtain to contain debris from forecourt renovation works at the National Maritime Museum. Project Overview Date: December, 2010 Location: Darling Harbour, New South Wales, Australia Features Summary Boom Length: Boom Material: Float: Ballast: Connectors: 120m with 1m skirt depth UV Resistant PVC [...]

Jemena

To custom design and manufacture a portable containment bund to contain leaking transformers in the field or at depots Project Overview Date: September, 2009 Location: Melbourne, Victoria, Australia Features Summary Materials used: Bund Dimensions: Capacity: Heavy duty XR5 geomembrane 12.5m long x 4.0m wide x 0.5m high 50,000L [...]

BP Gulf Ocean Boom

To custom design an ocean boom that would withstand an ocean environment in the Gulf of Mexico. BP requested a 26", 38" and 42" prototype to test and commission for use in these rugged conditions. Project Overview Date: June, 2010 Location: Houston, Texas, USA Features Summary Materials used: [...]