To design and manufacture a unique heavy duty containment boom with patented absorbtion boom attached. The boom was to be housed in a unique system operating from a 40' container allowing rapid deployment and convenient storage.

Project Overview

Date: August, 2010 Location: Perth, Western Australia, Australia

Features Summary

Boom Length:

Each boom is 12.0m long

Boom Material: XR-5 Geomembrane
Float: Closed Cell PE Foam
Ballast:
10mm Galvanised chain
Connectors: Universal connectors with toggle pins
Absorbtion Boom:
Patented polymer attached to larger containment boom allowing for easy replacement.

Project Summary

  • The design provided a containment boom that would both contain spills, absorb spills and could be stored easily.
  • Storage in 40' container was achieved in a tiered system allowing for rapid deployment on site and convenient storage on site
  • A unique boom design and storage design with a wide application